Castro d'Aire Tunnel - IP3 - Construction of the EN2 Link Road in Castro d' Aire

Designation of the Works

Castro d’Aire Tunnel – IP3 – Construction of the EN2 Link Road in Castro d’ Aire

Works Owner

Junta Autónoma de Estradas

Client

Sociedade de Empreitadas Adriano, S.A.

Description

Construction of a double road tunnel. This tunnel is 818 m long (each gallery) and its excavation transverse section varies between 76 m2 and 87 m2. Excavation: 118 010 m3. Concrete: 20.051 m3

Location/Site

Castro d’ Aire – Beira Interior, Portugal

Start Date

August, 1999

Execution Period

21 months