WORK

Excavation and Support System of Anllo Power Station Loading Tunnel

Designation of the Works

Excavation of the Loading Tunnel and the Surge Tank of Arroibar Power Station, in River Lérez

Designation of the Works

Soluziona Ingeniería, S.A., Spain

Client

Obras Subterráneas, S.A.

Description

Hydraulic Works – section: 10 m2. Tunnel 1500 linear metres long.

Location/Site

River Lérez, Cotobade and Campo Lameiro, Pontevedra, Spain

Start Date

November, 2014

Execution Period

9 months