WORK

Construction of Gardunha Tunnel I - A

Designation of the Works

Construction of Gardunha Tunnel I – A

Works Owner

SCUTVIAS – Autoestradas da Beira Interior, S.A.

Client

ACESTRADA – Construção de Estradas, A.C.E.

Description

This tunnel is 1 604 m long and has na excavation transverse section varying between 83 m2 to 97 m2. Excavation: 128.067 m3. Concrete: 20.457 m3.

Location/Site

Alpedrinha, Beira Interior, Portugal

Start Date

August, 2001

Execution Period

27 months