WORK

Gardunha Tunnel II - IP2 Covilhã - Soalheira - Southern Section

Designation of the Works

Gardunha Tunnel II – IP2 Covilhã – Soalheira – Southern Section

Works Owner

Junta Autónoma de Estradas

Client

Consórcio Somague / MSF / Construtora do Lena

Description

Construction of a double road tunnel. Both tunnels are parallel, are 275 m and 288 m long and an excavation transverse section with about 81 m2. Excavation: 49 700 m3. Concrete: 9 348 m3.

Location/Site

Alpedrinha, Beira Interior, Portugal

Start Date

March, 1999

Execution Period

9 months