Ponta do Sol Tunnel
WORK Ponta do Sol Tunnel Designation of the Works Link Road to the Town Ponta do Sol / Link Road to the Town Ponta do Sol – Emergency Galleries Works Owner Regional Office for Social Equipment and Transportation – Directorate of Regional Roads – A.R. Madeira Client Regional Office for Social Equipment and Transportation – […]
Gardunha Tunnel I – A
WORK Construction of Gardunha Tunnel I – A Designation of the Works Construction of Gardunha Tunnel I – A Works Owner SCUTVIAS – Autoestradas da Beira Interior, S.A. Client ACESTRADA – Construção de Estradas, A.C.E. Description This tunnel is 1 604 m long and has na excavation transverse section varying between 83 m2 to 97 […]
Loural Tunnel
WORK Execution of Loural Tunnel Works Owner Execution of Loural Tunnel Works Owner IGA – Investimentos e Gestão da Água, S.A. Client IGA – Investimentos e Gestão da Água, S.A. Description Construction of an hydraulic tunnel approximately 319 m long and an excavation section of 5,2 m2 for ZG3a and 5,9 m2 for ZG4a, with […]
Yellow Line Metro
WORK Tunnel execution of the 52nd. and 53rd. Partial Sections of the Yellow Line Designation of the Works Tunnel execution of the 52nd. and 53rd. Partial Sections of the Yellow Line Works Owner Metropolitano de Lisboa, E.P.E. Client Metropolitano de Lisboa, E.P.E. Description Tunnel execution of the 52nd. and 53rd. Partial Sections of the Lisbon […]
Ramela Tunnel
WORK Construction of Ramela Tunnel Designation of the Works Construction of Ramela Tunnel Works Owner SCUTVIAS – Autoestradas da Beira Interior, S.A. Client ACESTRADA – Construção de Estradas, A.C.E. Description Construction of a double road tunnel. Both tunnels are parallel, are 311 m and 337 m long and an excavation transverse section varying between 85 […]
Access tunnel to El Corte Inglés parking place
WORK Access tunnel to El Corte Inglés parking place in Lisbon Designation of the Works Access tunnel to El Corte Inglés parking place in Lisbon Works Owner El Corte Inglés Client Teixeira Duarte – Engenharia e Construções, S.A. Description Road Tunnel. This project foresees the execution of a gallery with a total development of 36,8 […]
Construction of the Water Intake
WORK Construction of the Water Intake on the Left Bank of Alvito Reservoir Designation of the Works Construction of the Water Intake Works Owner EDIA – Empresa de Infraestruturas e Desenvolvimento do Alqueva, S.A. Client EDIA – Empresa de Infraestruturas e Desenvolvimento do Alqueva, S.A. Description Contruction of a 213 m long mining tunnel using […]
Extension of Fajã do Rodrigues Irrigation – 2nd. Stage
WORK Extension of Fajã do Rodrigues Irrigation Channel to Ribeira do Inferno – 2nd. Stage Designation of the Works Extension of Fajã do Rodrigues Irrigation Channel to Ribeira do Inferno – 2nd Stage Works Owner IGA – Investimentos e Gestão da Água, S. A. Client Teixeira Duarte – Engenharia e Construções, S. A. Description Project, […]
Double road tunnel, EN2
WORK Castro d’Aire Tunnel – IP3 – Construction of the EN2 Link Road in Castro d’ Aire Designation of the Works Castro d’Aire Tunnel – IP3 – Construction of the EN2 Link Road in Castro d’ Aire Works Owner Junta Autónoma de Estradas Client Sociedade de Empreitadas Adriano, S.A. Description Construction of a double road […]
Extension Hydroelectric Power Station
WORK Extension of Fajã da Nogueira Hydroelectric Power Station Designation of the Works Extension of Fajã da Nogueira Hydroelectric Power Station Works Owner Empresa de Electricidade da Madeira, E.P. Client Teixeira Duarte – Engenharia e Construções, S.A. Description Execution of a 30 m gallery with 8 m2 section and rehabilitation of an existing gallery. Location/Site […]