WORK

Construction of Ramela Tunnel

Designation of the Works

Construction of Ramela Tunnel

Works Owner

SCUTVIAS – Autoestradas da Beira Interior, S.A.

Client

ACESTRADA – Construção de Estradas, A.C.E.

Description

Construction of a double road tunnel. Both tunnels are parallel, are 311 m and 337 m long and an excavation transverse section varying between 85 m2 and 101 m2. Excavation: 50 256 m3. Concrete: 10 235 m3.

Location/Site

Ramela, Beira Interior, Portugal

Start Date

January, 2001

Execution Period

17 months